The Lynch Mob Projects

In order to give an idea of the different challenges faced by the company we have selected four projects to demonstrate the broad cross-section of challenges which have been faced and surmounted by The Lynch Mob.

  1. Energex
  2. Berg Engineering
  3. Evans Deakin
  4. Fisher & Paykel

Energex

This project involved the installation and positioning of a 68 tonne Transformer. In itself this was not considered to be a difficult task.

energex1.jpg (19629 bytes)

energex2.jpg (14553 bytes)

What made it interesting was the fact that after removal from the truck it had to be transported down a laneway, turned 90 degrees and moved into the bay with 1 metre clearance on each side
It then had to be rotated a further 90 degrees and positioned against the wall.

energex3.jpg (10615 bytes)

It is only through the unique 4 Point Lifting and Tracking System that this was possible. With a little help from The Lynch Mob technical team of course.

totop.gif (1524 bytes)

Berg Engineering

For the company's relocation to new premises they enlisted the support of The Lynch Mob, a continuation of a 13 year relationship.

berg1.jpg (7010 bytes)

berg2.jpg (20215 bytes)

Existing Plant and Machinery had to be removed from the old site, transported across town and re-installed at the new site
The Lynch Mob were responsible for all operations involved in this move including the preparation and building of the new footings

berg3.jpg (15360 bytes)

The plant shown being installed is a 38 tonne Om Borer, one of only two in Australia

totop.gif (1524 bytes)

Evans Deakin

Seen here is the assembly and installation of the four quadrants of an Electric motor

eandd0.jpg (11056 bytes)

eandd1.jpg (11020 bytes)

The complete unit is of 18 metres diameter and 82 tonnes per Quadrant

totop.gif (1524 bytes)

Fisher & Paykel

The Lynch Mob are the preferred lifters for Fisher & Paykel Queensland and this status was more than justified with the installation of this equipment.
The floors of this factory are epoxy coated and it was imperative they were not scratched during the installation.
Again this was accomplished due to the nature of the 4 Point Lift System and its tracking system
An 83 tonne 900 Twin Injection Moulder for their Laundry Division

FandP1.jpg (9861 bytes)

fandp2.jpg (16417 bytes)

A 105 tonne Clamp End of a 1650 Moulder for the Laundry Division

totop.gif (1524 bytes)